Mundra Windtech Ltd
Client:
M/s Adani Ltd
Project Duration:
March to December 2022, 9 months
Location:
Mundra Kutch, Gujarat, India
Project brief:
The Mundra Windtech project involved the design, supply and erection of a pre-engineered building (PEB), with specific grade materials selected due to the corrosive nature of the site. Complete insulation was required as the plant was fully air-conditioned; all fasteners were hot-dip galvanized to ensure long-term durability and corrosion resistance.
Project Outcome
The success of this project ensured that we receive a repeat order of large volume. At M&B Engineering we are fully committed to managing large orders efficiently and ensuring project completion to the highest standards.